From audit to handover report: what a Kytom mission covers
A Kytom mission is an end-to-end commitment: technical audit, costed programming, APD/DCE design, managed execution and OPR handover, all under a single enforceable fixed price. You sign with a single point of contact, you receive a firm quote within 15 days, and you get a floor delivered in compliance with the regulatory requirements applicable to workplaces (R4213 standard), the environmental requirements in force on extensions, and the targeted threshold.
Across 47 floors delivered between 2022 and 2024, we measure compliance with the fixed price at 98% and an average lead time of 12 weeks on the typical 700 to 1,000 sqm area. The fixed price buys interface responsibility: disputes between trades (raised floor sealing versus power systems, insulation versus suspended ceiling) that generate 14 to 22 days of downtime with separate work packages are absorbed by us. For the CFO, this means a CAPEX of 400 to 1,200 EUR/sqm excl. tax, scheduled and amortisable over the lease term, without the unforeseen 12 to 18% change orders common elsewhere.