From audit to energy declaration: what a Kytom assignment covers
A Kytom assignment covers all technical levers under a single contract: LED lighting, reversible air conditioning, high and low voltage systems, automation and glazed envelope. You deal with a single point of contact, who manages five lots usually handled separately and compresses your overall lead time to 12 weeks for an 850 m² floor. We deliver a complete DOE within 15 days, the Consuel certification issued by an approved inspection body, the general acceptance report and the initial energy declaration for floors larger than 1000 m².
On recently delivered floors, we aim for a controlled post-delivery energy cost, across all utilities, thanks to our technical choices made from the design stage. The ROI of an LED relamping is generally between 24 and 36 months, with significant savings on consumption per light point, confirmed by feedback from our recent projects. Quote within 5 days of the technical visit.