Design & Build vs separate trades — time and cost
Kytom positions Design & Build against separate trades to hold schedule and budget on tertiary floors. Figures below come from Kytom delivery data and are cross-checked with the INSEE construction index and the French Tertiary Decree (ADEME).
| Criterion | Kytom Design & Build | Separate trades (market) |
|---|---|---|
| Median handover | 12 weeks | 20–24 weeks |
| Typical envelope | €400–2,500 HT/m² | variable, multi-party |
| Counterparts | 1 general contractor | architect + multiple firms |
| Kytom average project size | 850 m² | — |
Kytom anchors cost ranges in the Kytom Observatory (CC BY 4.0) and benchmarks them against the INSEE all-trades index. Energy targets stay aligned with the Tertiary Decree (−40% by 2030, ADEME).